Two numbers side by side: your target rate from the job thickness, and the actual rate from a real load. The badge tells you if you are on spec.
Set thickness in Job Setup above.
How many more feet you can pave with what is left, at the job width and target rate set above.
Each load = 18.5 tons (set in Job Setup).
For progress tracking
How much asphalt to order for a job at the job width and target thickness.
Gallons of tack to shoot for an area. Shows the safe min–max window for the chosen application, with the mid-rate as the suggested amount.
Loose material height to look for behind the screed for a target compacted thickness.